Aggregate Project Plan¶
A capacity-constrained plan for the mix and timing of a firm's product-development projects.
Core Idea¶
An aggregate project plan considers a firm's product-development projects together, matching their intended mix and timing to the people and other resources available. Wheelwright and Clark distinguish research, breakthrough, platform and derivative work, and account for alliances and partnerships as well. Managers compare the demands of current and proposed projects with capacity, decide which projects to support, and sequence starts in light of strategy. The plan is a portfolio-level view: an individual project's detailed schedule or budget does not by itself show the combined demand on shared development staff.[1]
The classifications express different roles and degrees of product or process change, not a universal schedule or fixed numerical mix. A partnership can pursue any of the other project types, so it need not be a mutually exclusive technical category. Past average requirements can inform estimates, but actual projects vary; research, maintenance and other commitments also require explicit accounting. A plan may defer, combine or cancel projects where the whole set exceeds capacity, subject to strategic and other constraints.[1]
How would you explain it like I'm…
All the Projects Together
Fitting Projects to Workers
Portfolio-Level Project Planning
PreQuip's Development Mix¶
Wheelwright and Clark describe PreQuip, a disguised name for a manufacturer of analytical equipment, as having about 30 development projects before its review. Management classified its work, considered customer needs and estimated average engineering months per project type from experience. It assigned approximately 50% of resources to platforms, 20% to derivatives and 10% each to breakthroughs and partnerships in its chosen mix, then selected projects accordingly. By mid-1990 the authors report 11 projects including three basic R&D projects; eight were commercial projects. Of 80 available full-time-equivalent engineers, 75 were assigned to those commercial projects, leaving a cushion.[1]
The firm's planned C-101 mass-spectrometer platform and later derivatives also illustrate sequencing: one derivative entered development around the time the platform moved to manufacturing prototyping, initially using designers whose platform work was ending. The authors report that commercial development productivity tripled between 1989 and 1991. Their account is an organizational case, not a controlled test that establishes the plan caused that change or guarantees similar results elsewhere.[1]
Boundaries¶
Aggregate planning supplements rather than replaces execution management for each project. It depends on how capacity, overlapping work, project interdependencies and uncertain demand are estimated; a category average is not a promise of a particular project's resource use. A fixed percentage mix or cancellation of a particular kind of project is not required in every organization. This entry uses one directly inspected organizational account; a separately evidenced contrasting implementation remains a research lead. The inspected text is a licensed reprint, rather than a check of the original journal issue's pagination.[1]
Structural Signature¶
- Project set: current and proposed product-development work, including relevant research and partner commitments.
- Classification and strategic roles: distinguish work such as platform, breakthrough and derivative development, while recognizing that partnerships can cut across types.
- Demand and capacity: estimate project resource requirements and compare the combined commitment with available resources over time.
- Mix decision: select, defer, combine or cancel work in light of capacity and strategic objectives.
- Sequence and revision: place starts and resource transfers in time and revisit the mix as estimates, strategy or capacity change.[1]
Clarity¶
If three proposals each need staff from the same engineering group, approving each in isolation can overcommit the group. The aggregate plan makes that shared demand visible and lets management change the mix or timing. The illustration states the planning logic, not a prediction of productivity.
Counterfactuals and Limits¶
A list with no estimate of shared demand or available capacity cannot on its own establish whether the proposed mix is feasible. A one-time capacity estimate can become obsolete; treating it as certainty may conceal a later bottleneck. Conversely, a portfolio can be deliberately below nominal capacity when a cushion is needed for uncertainty.[1]
Knowledge Transfer¶
Specify the development work included, project roles, capacity by resource and time, estimated requirements, selection criteria and sequencing assumptions. Compare the resulting aggregate demand against available capacity and record uncertainty and commitments outside the proposed set.
Neighborhood in Abstraction Space¶
Aggregate Project Plan sits in a sparse region of the domain-specific corpus (92nd percentile for distinctiveness): few abstractions share its structure, so a faithful description tends to retrieve it precisely.
Family — Growth Dynamics & Productivity Puzzles (14 abstractions)
Nearest neighbors
- Ecosystem Mismatch — 0.78
- Integrated Design — 0.78
- Capability Management in Business — 0.77
- Technology Push — 0.77
- Business systems planning — 0.77
Computed from structural-signature embeddings · 2026-11-14
References¶
[1] Steven C. Wheelwright and Kim B. Clark, “Creating Project Plans to Focus Product Development,” reprinted in Lowell D. Dye and James S. Pennypacker, eds., Project Portfolio Management: Selecting and Prioritizing Projects for Competitive Advantage (Center for Business Practices, 1999), 371–385; originally published in Harvard Business Review (1992). The reprint was inspected; original journal pagination was not independently checked. registry ↩a ↩b ↩c ↩d ↩e ↩f ↩g