29 C.F.R. § 1910.269 (Electric Power Generation, Transmission, and Distribution)¶
29 C.F.R. § 1910.269 (Electric Power Generation, Transmission, and Distribution).
Cited by¶
1 citation across 1 artifact.
Domain-specific¶
- Resource-Typing Mismatch
- . Cybersecurity incident response — a request for "incident responders" yields the wrong capability mix against the threat (SOC monitoring vs. malware reverse-engineering vs. cloud forensics vs. legal discovery). Public-works restoration — a request for "tree-removal crews" returns residential chain-saw crews where high-line arborists were needed for transmission-line clearance
Supported in partVerified against a saved copy of the source
“An employee who, through related training or on-the-job experience or both, is familiar with the special techniques and hazards involved in line-clearance tree trimming.”
- . Cybersecurity incident response — a request for "incident responders" yields the wrong capability mix against the threat (SOC monitoring vs. malware reverse-engineering vs. cloud forensics vs. legal discovery). Public-works restoration — a request for "tree-removal crews" returns residential chain-saw crews where high-line arborists were needed for transmission-line clearance
Verification¶
Does it exist? Not checked yet. This entry carries no identifier to resolve. It was extracted from the citation as written in the article, normalized, and deduplicated against the rest of the registry.
Does it back the claim? Read against the text for 1 of 1 citation: 1 supported in part. Each verdict is shown under its citation below, with what in the work backs the sentence.
Support is checked per citation rather than per work — the same source can be cited soundly in one article and wrongly in another. Per-citation recording began recently, so a citation with no recorded check is a gap in the record rather than evidence it went unchecked.
See how references were verified.
Registry ID ref:11b9d72cbee7 · see in the full table