A solution procedure for preemptive multi-mode project scheduling problem with mode changeability to resumption¶
Afshar-Nadjafi, B. (2014). A solution procedure for preemptive multi-mode project scheduling problem with mode changeability to resumption.
Cited by¶
1 citation across 1 artifact.
Domain-specific¶
Verification¶
This reference passed the adversarial substantiation pipeline: it was checked to exist and to support the claim it is attached to. See how references were verified.
Registry ID ref:13b0b5b62583 · see in the full table