Manual on Flood Forecasting and Warning¶
World Meteorological Organization. (2011). Manual on Flood Forecasting and Warning. World Meteorological Organization.
Cited by¶
1 citation across 1 artifact.
Each citation links to the sentence it supports in the citing article.
Mechanisms¶
- Flood Wave Preparation
- Its strength is manufacturing lead time against a wave you cannot stop: because the signal is read upstream and routed forward, downstream sites learn of the crest's timing and size well before it arrives, which is the whole leverage against an unavoidable front.
This sourceExplains how upstream observations and routing models forecast downstream flood magnitude and timing early enough to create warning lead time.
- Its strength is manufacturing lead time against a wave you cannot stop: because the signal is read upstream and routed forward, downstream sites learn of the crest's timing and size well before it arrives, which is the whole leverage against an unavoidable front.
Verification¶
Does it exist? Not checked yet. This entry carries no identifier to resolve. It was extracted from the citation as written in the article, normalized, and deduplicated against the rest of the registry.
Does it back the claim? Not recorded. The single citation of this work carries no recorded support check.
Support is checked per citation rather than per work — the same source can be cited soundly in one article and wrongly in another. Per-citation recording began recently, so a citation with no recorded check is a gap in the record rather than evidence it went unchecked.
See how references were verified.
Registry ID ref:1d1c01dc8b1f · see in the full table