Lean Hospitals¶
Graban, M. (2008). Lean Hospitals. Productivity Press.
Cited by¶
1 citation across 1 artifact.
Each citation links to the sentence it supports in the citing article.
Domain-specific¶
- Just-in-Time
- Lean manufacturing / Toyota Production System — the native habitat: small-lot pull-flow with kanban, andon, SMED, mixed-model sequencing, and supplier development, ported intact across automotive, electronics, FMCG, and aerospace lines. Healthcare operations — two-bin kanban for surgical-supply and drug stocking and emergency-department flow
This sourcePractitioner account of hospital lean, including two-bin kanban replenishment of supplies and lean work on emergency-department flow and pharmacy.
Supported in partVerified against a saved copy of the source
“managing inventory is a style of kanban called a two-bin system. This method uses two plastic bins at the”
- Lean manufacturing / Toyota Production System — the native habitat: small-lot pull-flow with kanban, andon, SMED, mixed-model sequencing, and supplier development, ported intact across automotive, electronics, FMCG, and aerospace lines. Healthcare operations — two-bin kanban for surgical-supply and drug stocking and emergency-department flow
Verification¶
Does it exist? Not checked yet. This entry carries no identifier to resolve. It was extracted from the citation as written in the article, normalized, and deduplicated against the rest of the registry.
Does it back the claim? Read against the text for 1 of 1 citation: 1 supported in part. Each verdict is shown under its citation below, with what in the work backs the sentence.
Support is checked per citation rather than per work — the same source can be cited soundly in one article and wrongly in another. Per-citation recording began recently, so a citation with no recorded check is a gap in the record rather than evidence it went unchecked.
See how references were verified.
Registry ID ref:25dcac2df696 · see in the full table