Digital DRS Feasibility Study — Phase 2¶
Futures, R. (2022). Digital DRS Feasibility Study — Phase 2: End-to-End System Design. Welsh Government.
Cited by¶
1 citation across 1 artifact.
Each citation links to the sentence it supports in the citing article.
Mechanisms¶
- Take-Back Pilot
- Its failure mode is that a pilot's flattering conditions may not survive scaling: an incentive, a hand-picked region, or a motivated early cohort can produce a return rate that collapses when the program goes wide and the novelty and subsidy fade (a return-rate analogue of the rebound the archetype warns about).
This sourceReports a 94% return rate in a constrained deposit-return trial while warning that its narrow container range limits what it demonstrates about scalability.
- Its failure mode is that a pilot's flattering conditions may not survive scaling: an incentive, a hand-picked region, or a motivated early cohort can produce a return rate that collapses when the program goes wide and the novelty and subsidy fade (a return-rate analogue of the rebound the archetype warns about).
Verification¶
Does it exist? Not checked yet. This entry carries no identifier to resolve. It was extracted from the citation as written in the article, normalized, and deduplicated against the rest of the registry.
Does it back the claim? Not recorded. The single citation of this work carries no recorded support check.
Support is checked per citation rather than per work — the same source can be cited soundly in one article and wrongly in another. Per-citation recording began recently, so a citation with no recorded check is a gap in the record rather than evidence it went unchecked.
See how references were verified.
Registry ID ref:2d6c124954fc · see in the full table