Granting and Renegotiating Infrastructure Concessions¶
Guasch, J. L. (2004). Granting and Renegotiating Infrastructure Concessions: Doing It Right.
Cited by¶
1 citation across 1 artifact.
Each citation links to the sentence it supports in the citing article.
Primes¶
- Incomplete Contract
- The city designs a gap-handler: a regulatory adjustment commission empowered to reset terms when rules change, with residual control reverting to the city.
This sourceDocuments long-term infrastructure concessions (notably water/wastewater) as incomplete contracts — regulatory-adjustment mechanisms, reversion of residual control, and renegotiation rights as layered gap-handling, with 74% of water-sector concessions renegotiated.
- The city designs a gap-handler: a regulatory adjustment commission empowered to reset terms when rules change, with residual control reverting to the city.
Verification¶
Does it exist? Not checked yet. This entry carries no identifier to resolve. It was extracted from the citation as written in the article, normalized, and deduplicated against the rest of the registry.
Does it back the claim? Not recorded. The single citation of this work carries no recorded support check.
Support is checked per citation rather than per work — the same source can be cited soundly in one article and wrongly in another. Per-citation recording began recently, so a citation with no recorded check is a gap in the record rather than evidence it went unchecked.
See how references were verified.
Registry ID ref:409be0c0e28d · see in the full table