Prefabricated and Modularized Residential Construction¶
Kim, S. (2025). Prefabricated and Modularized Residential Construction: A Review of Present Status, Opportunities, and Future Challenges. Buildings.
Cited by¶
1 citation across 1 artifact.
Each citation links to the sentence it supports in the citing article.
Primes¶
- Precomputation and Materialization
- The assembly could have been performed in place at the moment each floor was ready; the design instead performs it months earlier in a controlled shop and holds the finished units in a yard.
This sourceReviews modular bathroom pods assembled in a factory and later installed into high-rise residential buildings, reporting time and cost savings and improved quality control as the effects of moving the work off site.
- The assembly could have been performed in place at the moment each floor was ready; the design instead performs it months earlier in a controlled shop and holds the finished units in a yard.
Verification¶
This reference passed the adversarial substantiation pipeline: it was checked to exist and to support the claim it is attached to. See how references were verified.
Registry ID ref:4fe3a080de23 · see in the full table