Optimal two- and three-stage production schedules with setup times included¶
Johnson, S. M. (1954). Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1(1), 61-68.
Cited by¶
2 citations across 2 artifacts.
Each citation links to the sentence it supports in the citing article.
Primes¶
- Scheduling
This sourceClassic result showing that a specific sequencing rule minimizes makespan in the two-machine flow shop, formalizing the counterfactual logic that reordering tasks changes outcomes by a determinable amount.
- Sequencing
- It encourages practitioners to think in terms of dependencies, bottlenecks, and trade-offs, a counterfactual reordering logic Johnson (1954) introduced when he proved that a specific two-machine flow-shop sequence minimizes makespan—showing that order, not task content, drives the result.
This sourceClassic result showing that a specific sequencing rule minimizes makespan in the two-machine flow shop, formalizing the counterfactual logic that reordering tasks changes outcomes by a determinable amount.
- It encourages practitioners to think in terms of dependencies, bottlenecks, and trade-offs, a counterfactual reordering logic Johnson (1954) introduced when he proved that a specific two-machine flow-shop sequence minimizes makespan—showing that order, not task content, drives the result.
Verification¶
This reference passed the adversarial substantiation pipeline: it was checked to exist and to support the claim it is attached to. See how references were verified.
Registry ID ref:69e110b420ac · see in the full table