Macondo Well Deepwater Horizon Blowout¶
National Academy of Engineering and National Research Council. (2012). Macondo Well Deepwater Horizon Blowout: Lessons for Improving Offshore Drilling Safety. National Academies Press.
Cited by¶
1 citation across 1 artifact.
Domain-specific¶
- HAZOP Guideword Miss
- The industry response broadened the schemas: revised well-control review requirements, independent verification of pressure-test interpretation, and BOP reliability reassessment
Supported in partVerified against a saved copy of the source
“the BOP system were not consistent with a high-reliability, fail-safe device. (Finding 3.16)”
- The industry response broadened the schemas: revised well-control review requirements, independent verification of pressure-test interpretation, and BOP reliability reassessment
Verification¶
Does it exist? Not checked yet. This work's DOI is recorded above but has not been resolved against an external catalogue, so nothing here confirms the work exists.
Does it back the claim? Read against the text for 1 of 1 citation: 1 supported in part. Each verdict is shown under its citation below, with what in the work backs the sentence.