Scheduling a production line to minimize maximum tardiness¶
Jackson, J. R. (1955). Scheduling a production line to minimize maximum tardiness. Research Report 43.
Cited by¶
2 citations across 2 artifacts.
Each citation links to the sentence it supports in the citing article.
Primes¶
- Scheduling
- Listed in the references but not attached to a specific claim.
Mechanisms¶
- Earliest-Deadline-First Dispatch
- Its strength is that on a single resource it provably minimizes the maximum lateness — no rule bounds the worst miss more tightly (the earliest-due-date result)
This sourceStates Jackson’s earliest-due-date rule as optimal for minimizing maximum lateness on a single machine.
- Its strength is that on a single resource it provably minimizes the maximum lateness — no rule bounds the worst miss more tightly (the earliest-due-date result)
Verification¶
Does it exist? Not checked yet. This entry carries no identifier to resolve. It was extracted from the citation as written in the article, normalized, and deduplicated against the rest of the registry.
Does it back the claim? Not recorded. Neither this nor any other of the 2 citations of this work carries a recorded support check.
Support is checked per citation rather than per work — the same source can be cited soundly in one article and wrongly in another. Per-citation recording began recently, so a citation with no recorded check is a gap in the record rather than evidence it went unchecked.
See how references were verified.
Registry ID ref:7c3e1a7933a5 · see in the full table