Takt Time Planning for Construction of Exterior Cladding.¶
Frandson, A., Berghede, K., & Tommelein, I. D. (2013). Takt Time Planning for Construction of Exterior Cladding. Proceedings of the 21st Annual Conference of the International Group for Lean Construction (IGLC 21), 527-536.
Cited by¶
1 citation across 1 artifact.
Each citation links to the sentence it supports in the citing article.
Primes¶
- Unevenness Waste
- In construction it is the unsynchronized trade handoff that creates cascading waits even when each trade has an adequate crew, the takt mismatch being the binding cost.
This sourceShows that takt-time planning synchronises trade handoffs to reduce the cascading waits that unsynchronised handoffs produce despite adequate crews.
- In construction it is the unsynchronized trade handoff that creates cascading waits even when each trade has an adequate crew, the takt mismatch being the binding cost.
Verification¶
Does it exist? Not checked yet. This entry carries no identifier to resolve. It was extracted from the citation as written in the article, normalized, and deduplicated against the rest of the registry.
Does it back the claim? Not recorded. The single citation of this work carries no recorded support check.
Support is checked per citation rather than per work — the same source can be cited soundly in one article and wrongly in another. Per-citation recording began recently, so a citation with no recorded check is a gap in the record rather than evidence it went unchecked.
See how references were verified.
Registry ID ref:b1bb8b4a4a3f · see in the full table