Agile Project Management¶
Highsmith, J. A. (2004). Agile Project Management: Creating Innovative Products. Addison-Wesley.
Cited by¶
1 citation across 1 artifact.
Each citation links to the sentence it supports in the citing article.
Primes¶
- Concurrent, Cross-Functional Collaboration
- A common failure is either maintaining so much flexibility that decisions are never locked and the project stalls, or locking decisions so early that better designs are foreclosed
This sourceFoundational agile-PM text (by an Agile Manifesto co-author) advocating iterative, adaptive commitment — deferring irreversible design decisions while still converging, balancing the cost of indecision against premature lock-in. WebSearch-verified: 2004 is the FIRST edition (Addison-Wesley); the prime's '(2nd ed.)' is an error (2nd ed. = 2009) — see flag.
- A common failure is either maintaining so much flexibility that decisions are never locked and the project stalls, or locking decisions so early that better designs are foreclosed
Verification¶
Does it exist? Not checked yet. This entry carries no identifier to resolve. It was extracted from the citation as written in the article, normalized, and deduplicated against the rest of the registry.
Does it back the claim? Not recorded. The single citation of this work carries no recorded support check.
Support is checked per citation rather than per work — the same source can be cited soundly in one article and wrongly in another. Per-citation recording began recently, so a citation with no recorded check is a gap in the record rather than evidence it went unchecked.
See how references were verified.
Links previously used in the corpus¶
Before the registry existed this work was also linked 1 other way.
Registry ID ref:c29bd131a916 · see in the full table