Statistical Method from the Viewpoint of Quality Control¶
Shewhart, W. A. (1939). Statistical Method from the Viewpoint of Quality Control.
Cited by¶
1 citation across 1 artifact.
Each citation links to the sentence it supports in the citing article.
Primes¶
- Quality Control
- A specification says "voltage should be 5.0 ± 0.1 V"; quality control translates that into: measure samples from the line, plot them on a control chart, investigate if two consecutive samples fall outside the specification, stop the line if a trend emerges, the operationalization Shewhart (1939) developed in his statistical-method treatment that links specification to measurement-driven decision rules.
This sourceGraduate School, U.S. Department of Agriculture. Develops the operationalization of specification into decision boundaries through the three-step process of specification, production, and inspection; foundational treatment of QC as the gate that turns requirements into enforceable measurement-driven decisions.
- A specification says "voltage should be 5.0 ± 0.1 V"; quality control translates that into: measure samples from the line, plot them on a control chart, investigate if two consecutive samples fall outside the specification, stop the line if a trend emerges, the operationalization Shewhart (1939) developed in his statistical-method treatment that links specification to measurement-driven decision rules.
Verification¶
This reference passed the adversarial substantiation pipeline: it was checked to exist and to support the claim it is attached to. See how references were verified.
Registry ID ref:c300aa71e04d · see in the full table