TPL-001-5.1 — Transmission System Planning Performance Requirements¶
North American Electric Reliability Corporation. (2020). TPL-001-5.1 — Transmission System Planning Performance Requirements.
Cited by¶
1 citation across 1 artifact.
Each citation links to the sentence it supports in the citing article.
Mechanisms¶
- Stress Margin Simulation
- They sample thousands of scenarios — demand drawn from a summer-peak distribution, a single credible generator or line outage in each run (the N-1 criterion), derated line ratings on the hottest samples
This sourceN-1 transmission planning evaluates single generator or circuit contingencies against bus-voltage and facility-loading criteria.
- They sample thousands of scenarios — demand drawn from a summer-peak distribution, a single credible generator or line outage in each run (the N-1 criterion), derated line ratings on the hottest samples
Verification¶
Does it exist? Not checked yet. This entry carries no identifier to resolve. It was extracted from the citation as written in the article, normalized, and deduplicated against the rest of the registry.
Does it back the claim? Not recorded. The single citation of this work carries no recorded support check.
Support is checked per citation rather than per work — the same source can be cited soundly in one article and wrongly in another. Per-citation recording began recently, so a citation with no recorded check is a gap in the record rather than evidence it went unchecked.