IEEE Std 242-2001 (Buff Book)¶
IEEE. (2001). IEEE Std 242-2001 (Buff Book): IEEE Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems. IEEE.
Cited by¶
1 citation across 1 artifact.
Each citation links to the sentence it supports in the citing article.
Primes¶
- Latent Realizable Capacity
- The triggering condition is overcurrent sustained for a rated duration (the time-current curve specifies exactly when the disposition fires).
This sourceSpecifies the time–current characteristic that defines when a circuit breaker's standing interrupting capacity fires under overcurrent.
- The triggering condition is overcurrent sustained for a rated duration (the time-current curve specifies exactly when the disposition fires).
Verification¶
Does it exist? Confirmed. This work's DOI resolves to a registered record, which fixes its identity. That is all it fixes.
Does it back the claim? Not recorded. The single citation of this work carries no recorded support check.
Support is checked per citation rather than per work — the same source can be cited soundly in one article and wrongly in another. Per-citation recording began recently, so a citation with no recorded check is a gap in the record rather than evidence it went unchecked.
See how references were verified.
Registry ID ref:def7959fefa9 · see in the full table